We have provided staging solutions for U2 for five tours spanning a decade. For the 111 shows comprising the 360 tour, we crafted a multi-level main stage which could be installed in four hours and dismantled in two.
The multi-level main stage included a percussion lift and drum revolves. Camera tracking was also provided around the main stage and B-stage perimeters.
The main stage was surrounded by an oval-shaped, LED-lit walkway which was accessed by two automated sweeping bridges which hovered over the audience. Powered by our Navigator control system, each could sweep 100°.